| Year |
Customer |
End User |
Project |
Operation & Maintenance Service |
| 2025 |
PNC Corp |
목포해양경찰청 |
해양경비청 제어시스템 |
FAT, SAT for PLC and HMI |
| 2024 |
Hanwha E&C |
H&G Chemical |
Evergeen Project |
Install PO Injection board package, SAT |
| 2024 |
Daewoo E&C |
KET |
KET Phase-3 Metering System |
Install FC Panel and HMI, SAT |
| 2024 |
HJ Shipbuilding & Construction |
KOMIPO |
Boryeong New Combined Cycle Power Plant Unit 1 Construction Project / Natural Gas Metering System |
Install FC Panel, GC Cabinet and HMI, SAT |
| 2024 |
Emerson |
KOGAS |
Dangjin LNG Terminal |
Install FC Panel, GC Cabinet and HMI, SAT |
| 2024 |
Kiturami Boiler |
Kiturami Boiler |
Kiturami Boiler Gas Chromatograph Package |
FAT For GC Cabinet |
| 2023 |
KUMHO E&C |
Gumi Power Plant of Korea Westerm Power |
Gumi LNG Power Plant Natural Gas Supply Facility Installation Construction Project |
Install FC Panel, GC Cabinet and HMI, Double Modulation, SAT |
| 2023 |
KEDO E&S |
KOGAS |
SK Gas |
FAT, SAT for PLC and HMI |
| 2023 |
SK Eco Engineering |
IGE |
Green Energy Program Phase-1 Project |
Install FC Panel, GC Cabinet and HMI, SAT |
| 2023 |
Emerson |
Hyundai Heavy Industries |
H.3341/H.3342 GC Cabinet |
FAT For GC Cabinet |
| 2023 |
Emerson |
Korea Energy Terminal |
KET Phase 2 USM Metering Package |
Install FC Panel, GC Cabinet and HMI, SAT |
| 2023 |
Emerson |
Hyundai Heavy Industries |
Shenandoah FPS Project |
FAT for FC Panel, HMI |
| 2023 |
Ssangyong E&C |
KOSPO |
Shinsejong Combined Cycle Power Plant |
Install FC Panel, GC Cabinet and HMI, Double Modulation, SAT |
| 2022 |
Emerson |
Hyundai Heavy Industries |
H.3315/H.3316 GC Cabinet |
FAT For GC Cabinet |
| 2022 |
KOGAS |
KOGAS |
KOGAS in Yulchon |
FC Pnael for HMI Modification |
| 2022 |
Emerson |
KOGAS |
KOGAS in Boryeong, Jeonju, Jungri, Buksam, Hakjang, Pyeongdong, Mokpo |
FC Pnael for HMI Modification |
| 2022 |
Emerson |
KOGAS |
4GS Ultrasonic Meter Package |
Install FC Panel, GC Cabinet and HMI, SAT |
| 2021 |
DONGHAE ENG. |
KOGAS |
Gawangju, Changwon |
FAT, SAT for PLC and HMI |
| 2021 |
Emerson |
KOGAS |
USM Metering System in Bugok |
FAT, SAT for FC Panel |
| 2021 |
Emerson |
KOGAS |
Flow Computer Panel in Yangsan |
FAT for FC Panel |
| 2021 |
Emerson |
Hyundai Heavy Industries |
Gas Chromatograph Package (H.3110/3111) |
FAT For GC Cabinet |
| 2020 |
Hanwha E&C |
Hanwha Solution |
HYCO PJT |
Install FC Panel, GC Cabinet and HMI, Double Modulation, SAT |
| 2020 |
Emerson |
Hyundai Heavy Industries |
Gas Chromatograph Package (H.3107/3108/3109) |
FAT For GC Cabinet |
| 2020 |
Emerson |
Hyundai Mipo Dockyard |
Gas Chromatograph Package (H.8232) |
FAT For GC Cabinet |
| 2020 |
Korea Western Power |
Korea Western Power |
Coriolis Metering System in Pyeongtaek |
Install FC Panel, SAT |
| 2020 |
Emerson |
KOGAS |
KOGAS Onsan Metering System |
Install FC Panel, GC Cabinet and HMI, SAT |
| 2020 |
Korea Western-East Power Co., |
Korea Western-East Power Co., |
Coriolis Metering System |
Install FC Panel, GC Cabinet and HMI, SAT |
| 2020 |
Emerson |
SK Energy |
Ulsan CLX USM Metering System |
FAT, SAT for FC Panel , GC Cabinet |
| 2020 |
Emerson |
Hyundai Heavy Industries |
Gas Chromatograph Rack (H.3105/3106) |
FAT For GC Rack |
| 2019 |
Korea Nano Gas |
Boryeong LNG Terminal |
Gas Chromatograph Package in Lab |
FAT For GC Cabinet |
| 2019 |
Emerson |
KOGAS |
Gas Chromatograph Project in PyeongChang |
FAT For GC Cabinet |
| 2018 |
K-SYSTEM |
KOGAS |
Turbine Metering System in Yangyang V/S |
Install FC Panel, GC Cabinet and HMI, SAT
|
| 2018 |
Emerson |
KOGAS |
Flow Computer Panel & HMI Package for Jeju Thermal |
FAT for FC Panel
|
| 2018 |
K-SYSTEM |
KOGAS |
Turbine Metering System in Jinan V/S |
Install FC Panel, GC Cabinet and HMI, SAT
|
| 2018 |
K-SYSTEM |
KOGAS |
Turbine Metering System in Jeongnyang V/S |
Install FC Panel, GC Cabinet and HMI, SAT
|
| 2018 |
Emerson |
KOGAS |
Flow Computer Panel & HMI Package for Jeju Thermal |
FAT for FC Panel
|
| 2018 |
EWP |
EWP |
NG Flow Metering System, Ultrasonic Flow Meter in Ilsan |
FAT, SAT for FC Panel
|
| 2018 |
POSCO ENERGY |
POSCO ENERGY |
NG Flow Metering System, Coriolis, GC Cabinet in incheon |
FAT, SAT for FC Panel , GC Cabinet
|
| 2018 |
KOGAS |
KOGAS |
Flow Computer Panel Upgrade in Hongsung G/S |
FAT, SAT for FC Panel
|
| 2018 |
Emerson |
Hyundai Heavy Industries |
Gas Chromatograph Cabinet (H.2937, H.2938) |
FAT For GC Cabinet
|
| 2018 |
Emerson |
Hyundai Heavy Industries |
Gas Chromatograph Rack (H.2220) |
FAT For GC Rack
|
| 2018 |
HST |
|
Gas Chromatograph Rack (O2, H2S, CH4/CO2) |
FAT, SAT for GC Rack
|
| 2018 |
Del DC |
Del DC |
Exchange PLC and HMI Program |
Exchange PLC and HMI Program
|
| 2018 |
KOGAS |
KOGAS |
Exchange PLC for Pyeongtaek Thermal |
SAT for PLC
|
| 2017 |
Emerson |
Hyundai Heavy Industries |
NUOVO |
Commissioning for GC
|
| 2017 |
KOGAS |
KOGAS |
Flow Computer Panel Upgrade in Bundang G/S and Anjoong G/S |
FAT, SAT for FC Panel
|
| 2017 |
KOGAS |
KOGAS |
Flow Computer Panel Upgrade in Seocheon G/S |
FAT, SAT for FC Panel
|
| 2017 |
Emerson |
DSME |
LNG 2411, 2451, 2450, 2452, 2422, 2417 |
Commissioning for GC
|
| 2017 |
Emerson |
Hyundai Heavy Industries |
Hoegh 2552 |
FAT, SAT & Commissioning for FC, GC
|
| 2017 |
Emerson |
KOGAS |
Ultasonic Flow Metering System in Pyeongchon G/S |
FAT and SAT for FC Panel
|